Overview  |   Maps  |   Schedule  |   FAQ  |   Documents  |  Links |    Contact  |   Homepage  |  



 

Maps

**PLEASE NOTE**

The Preliminary Draft Environmental Impact Statement and Preliminary Engineering Report dated April 2006 contains the most current information on the proposed facilities and supercedes any information published in earlier reports or in the maps below. 

See the service area boundary for regional wastewater management facilities.

See facilities that would be built by 2011 (“Initial”) and those that are planned to meet 2030 needs (“Future”).

See the proposed WRF site layout (See Figures 30-1 and 30-2, PER Technical Memorandum No. 30)

Additional maps that were included in reports are listed on the Overview page in the Reports section with each specific report. Some reports also include maps that are not listed separately.